EPV Energy has more than 60 years’ experience of responsible energy generation. We continue to focus on emission-free generation with determination and purpose.
<div class="morgan-chart" id="morgan_chart_51"
data-chart-title="EPV Energy's specific CO2 emissions"
data-chart-type="line"
data-chart-series='[{"name":"g\/electricity kWh","data":[340,340,340,361,350,352,358,311,282,251,232,194,149,119,89,88,80,77,75,73,69,67,65,62,61,11]},{"name":"Average of CO2 emissions in the EU 2014","data":[275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9,275.9],"enableMouseTracking":false}]'
data-hide-markers="0"
data-hide-line-markers="1"
data-series-name=""
data-connector-width="0"
data-distance="-60"
data-y-title=""
data-hide-chart-title="0"
data-x-axis='["2005","2006","2007","2008","2009","2010","2011: R\u00f6ytt\u00e4 wind power farm
\n","2012: Increased use of biomass in Tornio and Sein\u00e4joki
\n","2013: Gasification plant in Vaasa
\n","2014: Swedish hydropower
\n","2015: Torkkola wind power farm and expansion of R\u00f6ytt\u00e4 wind power farm. Decreased coal condensing power capacity, Kristiina 2 and Tahkoluoto
\n","2016: Santavuori wind power farm
\n","2017","2018: Mets\u00e4l\u00e4 wind power farm\t
\n","2019: Olkiluoto 3","2020: Hydropower leasing in Norway ceases. Increased wind power capacity: Teuva and Simo","2021: Increased wind power capacity: N\u00e4rpi\u00f6","2022: Increased wind power capacity: Laihia","2023","2024: Solar power farm I","2025: Increased wind power capacity: Kuusamo I","2026","2027: Increased wind power capacity: Kuusamo II","2028: Solar power farm II","2029","2030: Replacement of CHP bio power plants in Vaasa and Sein\u00e4joki"]'
>